101 |
Work Commencement letter regarding infrastructure development of the University during 2020-21(S.H.: Replacement of underground damaged pipelines etc. for firefighting system installed in Saraswat Sadhna Sadan) |
13/04/2021 |
Download (157.09 KB)
|
- |
102 |
Work Commencement letter in connection with the work of Infrastructure development work during the year section 2020-21 of the university (Sub-head: Supply, installation, testing and commissioning of net switches, data and power points etc. for networking |
13/04/2021 |
Download (136.38 KB)
|
- |
103 |
Work Commencement letter regarding A/R & M/O work of the University during 2020-21(S.H.: White Washing, distempering, plastering, painting etc.) |
13/04/2021 |
Download (131.14 KB)
|
- |
104 |
Work Commencement letter regarding regarding renovation of toilets with fittings, pipelines, doors, door frame etc. in Saraswat Sadhna Sadan etc. complete of the University during 2020-21 |
13/04/2021 |
Download (139.84 KB)
|
- |
105 |
Tender acceptance letter in connection with the work of Infrastructure development work during the year section 2020-21 of the university (Sub-head: Supply, installation, testing and commissioning of net switches, data and power points etc. for networking |
05/04/2021 |
Download (203.63 KB)
|
- |
106 |
Tender Acceptance letter regarding infrastructure development of the University during 2020-21(S.H.: Replacement of underground damaged pipelines etc. for firefighting system installed in Saraswat Sadhna Sadan) |
05/04/2021 |
Download (149.9 KB)
|
- |
107 |
Tender Acceptance letter regarding renovation of toilets with fittings, pipelines, doors, door frame etc. in Saraswat Sadhna Sadan etc. complete of the University during 2020-21 |
05/04/2021 |
Download (148.93 KB)
|
- |
108 |
Tender Acceptance letter regarding repairing of kirloskar make 10HP water lifting motor pump set etc. installed in pump house of the university during 2020-21 |
05/04/2021 |
Download (127.92 KB)
|
- |
109 |
Work Commencement letter regarding regarding conversion of roof of 250KVA DG set and STP near gate 1 etc. of the University during 2020-21(S.H.: Plastering, Profile Sheet, External & Internal Painting etc.) |
25/03/2021 |
Download (113.65 KB)
|
- |
110 |
Short NIT regarding A/R & M/O work of the University during 2020-21(S.H.: White Washing, distempering, plastering, painting etc.) |
30/03/2021 |
Download (143.44 KB)
|
- |
111 |
Tender Acceptance letter regarding regarding conversion of roof of 250KVA DG set and STP near gate 1 etc. of the University during 2020-21(S.H.: Plastering, Profile Sheet, External & Internal Painting etc.) |
19/03/2021 |
Download (115.88 KB)
|
- |
112 |
NIT regarding Full Service Maintenance Agreement (FSMA) for a period of one year of two Photocopier Machines (Canon iR-ADV 4525) |
15/03/2021 |
Download (587.71 KB)
|
- |
113 |
NIT regarding renovation of toilets with fittings, pipelines, doors, door frame etc. in Saraswat Sadhna Sadan etc. complete of the University during 2020-21 |
25/03/2021 |
Download (132.85 KB)
|
- |
114 |
NIT regarding repairing of kirloskar make 10HP water lifting motor pump set etc. installed in pump house of the university during 2020-21 |
22/03/2021 |
Download (109.76 KB)
|
Corrigendum against the dates mentioned in the NIT Download (49.56 KB)  |
115 |
NIT regarding infrastructure development of the University during 2020-21(S.H.: Replacement of underground damaged pipelines etc. for firefighting system installed in Saraswat Sadhna Sadan) |
25/03/2021 |
Download (161.23 KB)
|
- |
116 |
Acceptance Letter regarding infrastructure development of the University during 2020-21(S.H.: S/I/T/C of Public Address System in Swarna Jayanti Sadan basement) |
31/03/2021 |
Download (93.85 KB)
|
- |
117 |
Infrastructure development of University during 2020-21 (S.H S/I/T/C of Networking Switch, Data & Electric Points etc in Library Building & Shaikshnik Sadan |
19/03/2021 |
Download (865.42 KB)
|
- |
118 |
NIT regarding conversion of roof of 250KVA DG set and STP near gate 1 etc. of the University during 2020-21(S.H.: Plastering, Profile Sheet, External & Internal Painting etc.) |
12/03/2021 |
Download (158.4 KB)
|
- |
119 |
NIT regarding infrastructure development of the University during 2020-21(S.H.: S/I/T/C of Public Address System in Swarna Jayanti Sadan basement) |
17/02/2021 |
Download (147.08 KB)
|
- |
120 |
Award letter regarding regarding the outsourcing of Accounts and Income Tax work in the SLBSNSU,Delhi |
31/01/2021 |
Download (70.49 KB)
|
- |